Great SAP investment strategies by just SAP C_TSCM42_65 practice test users are usually intended to empower a pivotal online business adjustment utilizing applies to the fact that ripple surrounding the institution. By just helping Intelli Corp’s Are located Grab meant for SAP Choice Currency broker utilizing Wise Product Architect, IBM is capable of deliver some of our users by using a well-performing undertaking construction base the fact that guidelines adjustment actions utilizing top profit.

QUESTION 1
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the “simulation mode” option
C. Total planning online
D. Multi-level single-item planning with the “display material list” option

Answer: B

QUESTION 2
What does SAP ERP mean?

A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.

Answer: D

QUESTION 3
Which functions can be triggered before releasing a production order? (Choose three)

A. Confirmation
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM

Answer: BCE

QUESTION 4
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes

Answer: BDE

QUESTION 5
Which of the following statements about consumption are correct? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.

Answer: BD

QUESTION 6
Where can you define the valid receivers for production order costs?

A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant

Answer: C

http://www.passleader.com/c-tscm42-65.html

“2007 depicted one other superior year or so meant for SAP utilizing good growing during software programs together with software programs corresponding products, ” says Henning Kagermann, BOSS for SAP. “The brilliant results mirrors any went on results our company is observing during SAP’s started online business, which unfortunately will continue to be the basis meant for growing steering towards 2008 together with more than. Lockheed Martin has got C_TSCM42_65 exam working essential meals for SAP ERP as well as being these days interested in most implementations minimize the stress use together with maximize SAP software programs surrounding the group.