PASSLEADER C_TSCM42_65 free dumps teaching stuff will probably engage in a crucial purpose with your strategy of arranging this quiz. The item besides caters people all the info the Quiz C_TSCM42_65 but delivers people fantastic review stuff that makes this SAP App Link official certifications quiz straightforward for people. PASSLEADER provides an all-inclusive test out alternative to assist you to come to be SAP authorized skilled. C_TSCM42_65 getting ready guideline is included with cost-free review guideline, small sample issues in addition to advice, pdf quiz, head dumps in addition to advice science lab of which provides you with the experience of precise C_TSCM42_65 test out.

QUESTION 1
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the “simulation mode” option
C. Total planning online
D. Multi-level single-item planning with the “display material list” option

Answer: B

QUESTION 2
What does SAP ERP mean?

A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.

Answer: D

QUESTION 3
Which functions can be triggered before releasing a production order? (Choose three)

A. Confirmation
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM

Answer: BCE

QUESTION 4
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes

Answer: BDE

QUESTION 5
Which of the following statements about consumption are correct? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.

Answer: BD

QUESTION 6
Where can you define the valid receivers for production order costs?

A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant

Answer: C

http://www.passleader.com/c-tscm42-65.html

PASSLEADER process test out issues are intended by means of hugely encountered in addition to authorized teachers that contain assemble the most beneficial C_TSCM42_65 sample questions that can reassure achievements with your quiz. By means of paying for PASSLEADER Precise testing quiz dilemma that is certainly generally informed, you may have all of that is required intended for performing this quiz issues.